UPPH Calculator

Calculate Units Per Person Hour from production output and manpower.

Production Manpower Productivity

Enter Production & Manpower Data

Enter output, working time and manpower.

units
Total units produced during the selected period.
minutes
Total scheduled working time for the process.
persons
Number of people directly involved in production.
minutes
Break, stoppage or non-working time.

UPPH Result

Units produced per person hour.

12.92 units / person hour
👥 Labour Productivity

The production output is 12.92 units per person hour based on the net working time.

⏱ Net Working Time
390.00 min
Production time − break/downtime
👥 Man-Hours
65.00
Workers × net hours
✓ Manpower
10 persons
Direct production manpower

UPPH Formula

Calculate labour productivity.

UPPH = Units Produced ÷ Man-Hours
Net Time Production Time − Break / Downtime
Man-Hours Workers × Net Working Time ÷ 60
UPPH Units Produced ÷ Man-Hours

How to Calculate UPPH

Follow these steps.

1
Enter Units Produced Enter the total production output.
2
Enter Production Time Enter total scheduled production time in minutes.
3
Enter Number of Workers Enter direct manpower used in the process.
4
Enter Break / Downtime Enter non-working time to calculate net working time.
5
Calculate UPPH The calculator converts net time into man-hours and calculates UPPH.

Practical Manufacturing Example

Example of labour productivity.

Parameter Value
Units Produced840 units
Production Time420 min
Break / Downtime30 min
Net Working Time390 min
Workers10 persons
Man-Hours65.00 hours
UPPH12.92 units/person-hour
UPPH = 840 ÷ 65 = 12.92 Units / Person Hour