UPH Calculator

Calculate Units Per Hour from production output and net available production time.

Production Manufacturing Productivity

Enter Production Data

Enter production output and available time.

units
Total good/produced units during the entered period.
minutes
Total scheduled production time for the period.
minutes
Unavailable production time during the entered period.

UPH Result

Production output per available hour.

120.00 units / hour
⚡ Production Rate

The production rate is 120.00 units per hour based on the net available production time.

⏱Net Production Time
420.00 min
Production time − downtime
📈Units / Minute
2.000
Production rate per minute
⚙Cycle Time
30.00 sec
Average time per unit

UPH Formula

Calculate production output per hour.

UPH = Units Produced ÷ Net Production Time × 60
Net Time Production Time − Downtime / Loss
Units / Min Units Produced ÷ Net Production Time
Cycle Time 60 ÷ UPH = minutes per unit × 60 = seconds per unit

How to Calculate UPH

Follow these simple steps.

1
Enter Units Produced Enter the total units produced during the selected period.
2
Enter Production Time Enter the scheduled production time in minutes.
3
Enter Downtime Enter machine or process downtime in minutes.
4
Calculate Net Production Time Subtract downtime from production time.
5
Calculate UPH Divide units produced by net production time and multiply by 60.

Practical Manufacturing Example

See how UPH is calculated.

ParameterValue
Units Produced840 units
Production Time480 min
Downtime60 min
Net Production Time420 min
UPH120 units/hour
UPH = 840 ÷ 420 × 60 = 120 Units/Hour